Test Time vs BER and Confidence Level Using Excel

I am currently working as a project manager on a serial data channel qualification task. During this work, I need to estimate the time required to perform dozens of Bit Error Rate (BER) measurements under different scenarios (see Figure 1). In these measurements, we are working to ensure that our BER is always 1E-10 or less. I have performed this calculation many times and have derived all the associated formulas here. BER is a statistical parameter and its measurement is a function of the confidence level you want in your answer.  In this case, we want the highest confidence level possible consistent with a two-week test effort. Continue reading